Hartco Enterprises

Category: Office buildings

In the first phase of the project, the existing warehouse was totally renovated with new power, lighting and air conditioning, to set up for a computer production assembly line. In the second phase, the existing smaller office building was totally demolish and a new high-quality office building of 40,000 sq.ft. on two (2) floors was built and connected to the existing 45,000 sq.ft. warehouse. High quality millwork and laminate finishes. Several specialized "climate-controlled" dust-free computer rooms were built. Also, a new production warehouse (with "dust-free" assembly rooms) of 20,000 sq.ft. was added to the existing. A complete cooking kitchen and cafeteria was incorporated.

 

> Click here to return to office buildings category.