HI-TEC INDUSTRY PROFESSIONAL VIDEO AND AUDIO CIRCUIT PRODUCTION

Category: Office buildings

NAME:

HI-TEC INDUSTRY PROFESSIONAL VIDEO

AND AUDIO CIRCUIT PRODUCTION

LOCATION:

Saint-Laurent, Que.

DELIVERY DATE:

----

 

CONSTRUCTION DETAILS

 

TYPE:

Three (3) storey fully integrated office, warehouse and “Clean Room” production facility

SIZE:

60,000 sq.ft.

PROJECT COST:

$ 3,977,000

NBR STOREYS:

Three (3) floors

CEILING HEIGHT:

9’-0” clear

LOADING DOCKS:

Two (2): one (1) truck level and one (1) grade level

 

SPECIAL FEATURES

 

ARCHITECTURAL:

This building had a precast concrete principal facade and curtain wall glazing. There was one elevator included with a provision for a second one. The entire interior was “custom-designed” high tech finishes with low static floors and walls. Raised computer floors were provided in certain areas. All toilets and main stair were ceramic tiles finishes

MECHANICAL:

The entire building was to have 22 separate zones controlled with V.A.V. boxes; a fresh air system, central humidification and energy management system were also included. There was one complete air change per hour in the factory portion. The building was completely sprinklered. All washrooms were high quality commercial type fixtures. The building was heated with gaz and supplemental electric baseboards

STRUCTURAL:

The building was a steel structure with “poured in place” concrete slabs and with reinforced concrete foundations

ELECTRICAL:

The new main electrical entry was 800 amps, 347/600 volts with a 45 KVA transformer. All fluorescent lighting in the offices with glare-proof computer lenses

CONSTRUCTION TIME:

Eight (8) months

 

PARTICULARITIES

This building was a complete “design-build” project based on Tridôme coordinating all aspects of architectural, interior –design structural, mechanical and electrical elements. Tridôme was responsible for all soil testing, permits, insurance and bonding.

 

N.B.:

Also, Tridôme did a complete financial analysis of the existing multi-location usage of the client, in order to validate the economic decisions to the company’s board of directors.

 