CONSTRUCTION DETAILS

 

TYPE:

Construction of a new public Sports Complex on a “Design Build” basis

SIZE:

40,000 sq.ft.

PROJECT COST:

$6,325,000 million

NBR STOREYS:

1

CEILING HEIGHT:

15 ft and 30 ft

LOADING DOCKS:

NA

 

SPECIAL FEATURES

 

ARCHITECTURAL:

New multi-purpose sports complex built for the city’s usage on public property.  Exterior stone and torrefied wood finishes.  Interior male and female complete locker rooms and showers

STRUCTURAL:

Post and beam, exposed B.C. Fir structural wood, spanning 112 ft. at 30 ft. high.  Full height concrete basement below structural slab at ground floor

MECHANICAL:

This building has central ducted air conditioning with geothermal wells as a power source

ELECTRICAL:

Low energy consumption lighting fixtures. Specialized indirect lighting design over entire playing field

CONSTRUCTION TIME:

1 year

 

PARTICULARITIES

 

 

REFERENCES:

L'Ecuyer LefaivreArchitectes

450 971 0606

 

> Click here to return to commercial buildings category.

LABORATOIRE CHIMIE CEGEP ST-JÉRÔME | Tridôme | Tridôme

LABORATOIRE CHIMIE CEGEP ST-JÉRÔME

Category: Institutional buildings

NAME:

LABORATOIRE CHIMIE CEGEP ST-JÉRÔME

LOCATION:

St-Jérôme, Quebec

DELIVERY DATE:

September 2011

 

CONSTRUCTION DETAILS

 

TYPE:

Major renovations of the Cegep to build specialized chemical laboratories

SIZE:

10,000 sq. ft.

PROJECT COST:

$1,750,000

NBR STOREYS:

1

CEILING HEIGHT:

10 ft.

LOADING DOCKS:

NA

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Removal of all asbestos in the walls and ceilings using special personnel security methods.  Specialized acid resistant flooring and counter top materials

STRUCTURAL:

NA

MECHANICAL:

New specialized laboratory quality Fume Hoods, ducted to the exterior.  New overall heating ventilations and air conditioning system

ELECTRICAL:

New hi-quality, low energy indirect lighting system and specialized wiring for all chemical instruments

CONSTRUCTION TIME:

6 months

 

PARTICULARITIES

Hi-quality finished laboratory tables, and equipment built for chemical resistance

 

REFERENCES:

Nathalie Pelchat, Tel: 450 436 1580 x 2332

 

> Click here to return to institutional buildings category.

ECOLE PRIMAIRE MERCIER | Tridôme | Tridôme

ECOLE PRIMAIRE MERCIER

Category: Institutional buildings

NAME:

ÉCOLE PRIMAIRE MERCIER

LOCATION:

Mercier, Quebec

DELIVERY DATE:

September 2012

 

CONSTRUCTION DETAILS

 

TYPE:

New Public Elementary School

SIZE:

35,000 sq. ft.

PROJECT COST:

$6,700,000

NBR STOREYS:

2 floors

CEILING HEIGHT:

10 feet

LOADING DOCKS:

NA

 

SPECIAL FEATURES

 

ARCHITECTURAL:

New modern style curtain wall with metal tympan panels and torrefied wood design.  New multi-purpose Gymnasium with adjacent glass atrium and all locker rooms and shower facilities

STRUCTURAL:

Standard structure steel and concrete slab on grade.  Entire building with all concrete block dividing walls, designed for seismic loading

MECHANICAL:

Entire building is air conditioned.  Exterior has a large retention basin for water sewer overflow.  Sprinkler system designed for seismic loading

ELECTRICAL:

New style low energy consumption light fixtures, all installed with seismic supports

CONSTRUCTION TIME:

1 year

 

PARTICULARITIES

 

 

REFERENCES:

Sandra Sheehy, Architecte – Tel: 514 380 8899

 

> Click here to return to institutional buildings category.

TEX-DYE INDUSTRIES INC. “PHASE III” | Tridôme | Tridôme

TEX-DYE INDUSTRIES INC. “PHASE III”

Category: Industrial buildings

NAME:

TEX-DYE INDUSTRIES INC. "PHASE III”

LOCATION:

Lachine, Que.

DELIVERY DATE:

1994

 

CONSTRUCTION DETAILS

 

TYPE:

Structural steel

SIZE:

3,500 sq.ft.

PROJECT COST:

$ 100,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

11 feet

LOADING DOCKS:

 

 

SPECIAL FEATURES

 

ARCHITECTURAL:

n/a

MECHANICAL:

n/a

STRUCTURAL:

New structural steel and concrete mezzanine built over existing space being used as offices and manufacturing areas. Heavy loading design (200 lb. per sq.ft.) of steel required special beams, joists and columns. Entire structure built on end-bearing piles put in place through the existing slab

ELECTRICAL:

 

CONSTRUCTION TIME:

Three (3) weeks

 

PARTICULARITIES

All extension was completed without any interruption of the daily activities of the company

 

REFERENCES:

Mr. and Mrs. W. Mashal

514 932-1160

 

> Click here to return to industrial buildings category.

ROLLS ROYCE CANADA LTD | Tridôme | Tridôme

ROLLS ROYCE CANADA LTD

Category: Industrial buildings

NAME:

ROLLS ROYCE CANADA LTD

LOCATION:

Lachine, Que.

DELIVERY DATE:

1990

 

CONSTRUCTION DETAILS

 

TYPE:

Construction of a fabrication and assembly plant for large jet engines

SIZE:

55,000 sq.ft

PROJECT COST:

$ 2,600,000

NBR STOREYS:

One (1) storey, two different roof levels

CEILING HEIGHT:

38' and 26'

LOADING DOCKS:

One existing which was renovated. Two overhead direct-entry doors

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Large & deeply depressed area all waterproofed

STRUCTURAL:

Complete area is designed for rolling cranes and vertical extensions

MECHANICAL:

Standard

ELECTRICAL:

Standard

CONSTRUCTION TIME:

Eight (8) months

 

PARTICULARITIES

Complex process work was a part of the contract

 

REFERENCES:

Mr. Lucio D'Alessandro, Project Manager

(514) 631-3541

 

> Click here to return to industrial buildings category.

SUPERIOR PROPANE | Tridôme | Tridôme

SUPERIOR PROPANE

Category: Industrial buildings

NAME:

SUPERIOR PROPANE

LOCATION:

Saint-Constant, Que.

DELIVERY DATE:

1995

 

CONSTRUCTION DETAILS

 

TYPE:

Warehouse storage for propane tanks

SIZE:

5,000 sq.ft

PROJECT COST:

$ 175,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

15 feet

LOADING DOCKS:

Five (5)

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Complete balloon-wood frame construction with pre-finished metal siding

MECHANICAL:

Several large passive louvered vents to ensure adequate gas ventilation

STRUCTURAL:

Clear span wood roof trusses. Slab on controlled fill at 4 feet high above surrounding grade.

ELECTRICAL:

Standard lighting and distribution. New electrical entry

CONSTRUCTION TIME:

Two and half (2½) months

 

PARTICULARITIES

Propane gas filling and storage facility at main distribution headquarters for Montreal

 

REFERENCES:

Mr. Alain Duclos, SERDEQ Inc.

Tel. : (418) 835-5431

 

 

> Click here to return to industrial buildings category.

MONTREAL PLAYSKOOL | Tridôme | Tridôme

MONTREAL PLAYSKOOL

Category: Institutional buildings

NAME:

MONTREAL PLAYSKOOL

LOCATION:

Montreal, Que.

DELIVERY DATE:

1985

 

CONSTRUCTION DETAILS

 

TYPE:

Nursery school

SIZE:

6,000 sq.ft

PROJECT COST:

$ 50,000

NBR STOREYS:

Three (3)

CEILING HEIGHT:

11 feet

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Renovation to an existing nursery school gymnasium, lockers, classroom and washroom area

MECHANICAL:

Standard

STRUCTURAL:

Standard

ELECTRICAL:

Standard

CONSTRUCTION TIME:

One (1) month

 

PARTICULARITIES

n/a

 

REFERENCES:

Mr. Leon Hocheglaube

(514) 488-9148

 

> Click here to return to institutional buildings category.

MONTREAL CHILDREN’S HOSPITAL | Tridôme | Tridôme

MONTREAL CHILDREN’S HOSPITAL

Category: Institutional buildings

NAME:

MONTREAL CHILDREN'S HOSPITAL

LOCATION:

Montreal, Que.

DELIVERY DATE:

1985

 

CONSTRUCTION DETAILS

 

TYPE:

Office renovations

SIZE:

n/a

PROJECT COST:

$ 25,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

9 feet

LOADING DOCKS:

 

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Complete construction of new research center offices and new puppet theater for "Disturbed Children" treatment

MECHANICAL:

Standard

STRUCTURAL:

Standard

ELECTRICAL:

Standard

CONSTRUCTION TIME:

Three (3) months

 

PARTICULARITIES

Special "soundproof theater" design incorporated within the office space

 

REFERENCES:

Mr. Danuta Rylski, Administrative Director

(514) 934-4300

 

> Click here to return to institutional buildings category.

MONIT INTERNATIONAL for the INTERNATIONAL CIVIL AVIATION ASSOCIATION | Tridôme | Tridôme

MONIT INTERNATIONAL for the INTERNATIONAL CIVIL AVIATION ASSOCIATION

Category: Office buildings

NAME:

MONIT INTERNATIONAL

for the International Civil Aviation Association

LOCATION:

Montreal, Que.

DELIVERY DATE:

1992

 

CONSTRUCTION DETAILS

 

TYPE:

Renovations of elevators, lobbies, bathrooms and corridors

SIZE:

15,000 sq.ft.

PROJECT COST:

$ 1,350,000

NBR STOREYS:

Twenty four (24)

CEILING HEIGHT:

9 ft

LOADING DOCKS:

 

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Demolition of the existing finishes and remodeling of every storeys according to new design and engineering lay out. Ceiling light coves bulkheads and acoustical tiles. Floors : insert carpets and granite and marble tiles. Walls : Vinyl wall covering in lobbies and corridors. Ceramic tiles on walls and floors in the bathrooms

MECHANICAL:

H.V.A.C. : updated ductwork and diffusers, balanced the system and updated controls. Plumbing : removed existing and provided new plumbing fixtures. Sprinklers : minor adjustments to existing system

STRUCTURAL:

n/a

ELECTRICAL:

Refurbished the existing panels. Added new light fixtures and service outlets

CONSTRUCTION TIME:

Seven (7) months

 

PARTICULARITIES

This work was performed after office hours with special security systems and hoarding for dust and noise proofing

 

REFERENCES:

Mr. Pierre Ciucioletta, Vice-President

(514) 933-3000

 

> Click here to return to office buildings category.

MAIMONIDES HOSPITAL | Tridôme | Tridôme

MAIMONIDES HOSPITAL

Category: Institutional buildings

NAME:

MAIMONIDES HOSPITAL

LOCATION:

Montreal, Que

DELIVERY DATE:

---

 

CONSTRUCTION DETAILS

 

TYPE:

Concrete high-rise building. Renovation in multiple phases.

SIZE:

30,000 sq.ft.

PROJECT COST:

$ 1,200,000

NBR STOREYS:

Eight (8

CEILING HEIGHT:

Eight (8) feet

LOADING DOCKS:

 

 

SPECIAL FEATURES

 

ARCHITECTURAL:

The renovation of 22 main bathing and washrooms areas, which took place in two phases. In addition, as a separate tender which Tridôme won on competitive bid, a complete renovation on the main chapel took place at the same time as Phase I of the washroom renovation.

MECHANICAL:

Complete renovation and new installation of the ductwork and main roof top air handling equipment

STRUCTURAL:

Reinforced concrete hi-rise structure (8 floors).

ELECTRICAL:

Modify and install new lighting (recessed pot lights) at new washrooms

CONSTRUCTION TIME:

Six (6) months

 

PARTICULARITIES

This complex renovation was required to take place without disturbing or inconveniencing any of the elderly and disabled long-term hospital patients. Therefore, the phasing and security of the work was critical. All access for construction demolition was required to be performed from the exterior. Therefore, a full time scissors-lift crane was used with special security and direct passages from the interior. All specialty bathing areas and washrooms were demolished totally and rebuilt with new walls,

floors and ceilings. All plumbing, mechanical and electrical was changed and all ceramic tile finishing (floor to ceiling) and bathing fixtures were installed (hi-pressure whirlpool baths). All finishes in the chapel were demolished and re-built. High level millwork. Complete works were done without any interruption of the daily activities of the hospital

 

REFERENCES:

Mrs. Barbara Gold, Executive Director

Tel.: (514) 483-2121

 

> Click here to return to institutional buildings category.

JEAN COUTU PHARMACY | Tridôme | Tridôme

JEAN COUTU PHARMACY

Category: Industrial buildings

NAME:

Jean Coutu Pharmacy

LOCATION:

Montreal, Que

DELIVERY DATE:

---

 

CONSTRUCTION DETAILS

 

TYPE:

Major repairs to concrete structural slabs, masonry, walls and roof of an existing downtown historical building.

SIZE:

n/s

PROJECT COST:

$ 500,000

NBR STOREYS:

Three (3)

CEILING HEIGHT:

12’-0’’

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

STRUCTURAL:

Detailed structural repair work to columns, beams and concrete slabs of the structure.  Temporary scaffolding and structural support of the concrete structure. 

Removing spalling and decayed concrete and inserting new reinforcing steel with grout, then re-forming and re-pouring new concrete to strengthen all the beams, columns and slabs.

 

Reconstruction of parapet walls and insulation.

 

Rebuilding of one exterior masonry wall.

 

Recoating of one exterior masonry wall with insulation and polymeric compound.

 

Remove and install a complete new roofing system with new insulation.

 

All work done without interruption of day to day activities of the pharmacy of the ground level.

CONSTRUCTION TIME:

Six (6) months

 

PARTICULARITIES

Work was done on an aging existing concrete building in a downtown location with highly limited access.

 

REFERENCES:

Erik Vincent, Project Manager

Tel. 450-646-9611 ext. 1312

 

> Click here to return to industrial buildings category.

HI-TEC INDUSTRY PROFESSIONAL VIDEO AND AUDIO CIRCUIT PRODUCTION | Tridôme | Tridôme

HI-TEC INDUSTRY PROFESSIONAL VIDEO AND AUDIO CIRCUIT PRODUCTION

Category: Office buildings

NAME:

HI-TEC INDUSTRY PROFESSIONAL VIDEO

AND AUDIO CIRCUIT PRODUCTION

LOCATION:

Saint-Laurent, Que.

DELIVERY DATE:

----

 

CONSTRUCTION DETAILS

 

TYPE:

Three (3) storey fully integrated office, warehouse and “Clean Room” production facility

SIZE:

60,000 sq.ft.

PROJECT COST:

$ 3,977,000

NBR STOREYS:

Three (3) floors

CEILING HEIGHT:

9’-0” clear

LOADING DOCKS:

Two (2): one (1) truck level and one (1) grade level

 

SPECIAL FEATURES

 

ARCHITECTURAL:

This building had a precast concrete principal facade and curtain wall glazing. There was one elevator included with a provision for a second one. The entire interior was “custom-designed” high tech finishes with low static floors and walls. Raised computer floors were provided in certain areas. All toilets and main stair were ceramic tiles finishes

MECHANICAL:

The entire building was to have 22 separate zones controlled with V.A.V. boxes; a fresh air system, central humidification and energy management system were also included. There was one complete air change per hour in the factory portion. The building was completely sprinklered. All washrooms were high quality commercial type fixtures. The building was heated with gaz and supplemental electric baseboards

STRUCTURAL:

The building was a steel structure with “poured in place” concrete slabs and with reinforced concrete foundations

ELECTRICAL:

The new main electrical entry was 800 amps, 347/600 volts with a 45 KVA transformer. All fluorescent lighting in the offices with glare-proof computer lenses

CONSTRUCTION TIME:

Eight (8) months

 

PARTICULARITIES

This building was a complete “design-build” project based on Tridôme coordinating all aspects of architectural, interior –design structural, mechanical and electrical elements. Tridôme was responsible for all soil testing, permits, insurance and bonding.

 

N.B.:

Also, Tridôme did a complete financial analysis of the existing multi-location usage of the client, in order to validate the economic decisions to the company’s board of directors.

 

> Click here to return to office buildings category.

FIST PRO SAINT-CONSTANT | Tridôme | Tridôme

FIST PRO SAINT-CONSTANT

Category: Commercial buildings

NAME:

FIST PRO SAINT-CONSTANT

LOCATION:

Saint-Constant, Que.

DELIVERY DATE:

2004

 

CONSTRUCTION DETAILS

 

TYPE:

Construction of a new commercial shopping centre – “Design-Build” Turn Key project

SIZE:

22,000 sq.ft.   

PROJECT COST:

$ 1,325,000

NBR STOREYS:

One

CEILING HEIGHT:

20 feet

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Eight (8) tenants – Shell only “Design Build”. Exterior, glass, brick and stucco

MECHANICAL:

Supply and install roof top units to each tenant. Installation of sanitary and storm drains. Interior finish done by each tenant

STRUCTURAL:

Steel structure complete with a standard foundation

ELECTRICAL:

Installation of main electrical entry with independent switches. Electrical distribution done by each tenant

CONSTRUCTION TIME:

Ten (10) weeks

 

PARTICULARITIES

“Design Build” project

 

REFERENCES:

Mr. Luc Fréchette, Project Manager

Tel.: (613) 721-2200

 

> Click here to return to commercial buildings category.

CANDEREL CORPORATION | Tridôme | Tridôme

CANDEREL CORPORATION

Category: Industrial buildings

NAME:

CANDEREL CORPORATION

LOCATION:

Lachine, Que.

DELIVERY DATE:

1987

 

CONSTRUCTION DETAILS

 

TYPE:

Renovation and addition of freight elevators and stairwells to existing warehouse building

SIZE:

n/a

PROJECT COST:

$ 100,000

NBR STOREYS:

Six (6)

CEILING HEIGHT:

Miscellaneous

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Standard

MECHANICAL:

Standard

STRUCTURAL:

Special requirements for structural ring pour-in-place beams in new block walls to create rigid free standing structure

ELECTRICAL:

Standard

CONSTRUCTION TIME:

Height (8) weeks

 

PARTICULARITIES

Medium rise addition to an existing building with demolition at each of six (6) levels to connect new freight elevators

 

REFERENCES:

Mr. Jonathan Weiner, President

(514) 842-8636

 

> Click here to return to industrial buildings category.

AGROPUR | Tridôme | Tridôme

AGROPUR

Category: Industrial buildings

NAME:

AGROPUR

LOCATION:

Amqui, Que

DELIVERY DATE:

1986

 

CONSTRUCTION DETAILS

 

TYPE:

Construction of an extension to the refrigerated warehouse and associated work with the existing plant

SIZE:

30,000 sq.ft.

PROJECT COST:

$ 2,300,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

21 feetè

LOADING DOCKS:

Seven (7)

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Standard

MECHANICAL:

Standard

STRUCTURAL:

Standard

ELECTRICAL:

Standard

CONSTRUCTION TIME:

Three (3) months

 

PARTICULARITIES

Freezer partially on pylons

 

REFERENCES:

Mr. Marc Caillé, Eng., Properties Director

(514) 375-1991

 

> Click here to return to industrial buildings category.

KEYSTONE INDUSTRIES | Tridôme | Tridôme

KEYSTONE INDUSTRIES

Category: Office buildings

NAME:

Keystone industRies

LOCATION:

Montreal (Saint-Laurent), Que.

DELIVERY DATE:

2003

 

CONSTRUCTION DETAILS

 

TYPE:

Renovation to existing building (± 20,000 sq.ft.) of office space and (±50,000 sq.ft.) of warehouse space

SIZE:

70,000 sq.ft.

PROJECT COST:

$ 1,150,000

NBR STOREYS:

Two (2)

CEILING HEIGHT:

12’-0” and 20’-0”

LOADING DOCKS:

Ten (10)

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Complete “High Level” interior renovation of offices on two floors, new granite floors and wood paneling within the reception area. New showroom c/w wall hanging system and free standing fixtures.

MECHANICAL:

Re-work existing systems. Made upgrades for new layout. Adding a new make up air system within the warehouse. New underground for new warehouse cafeteria and washrooms. Designed and built a new vacuum system for production equipment.

STRUCTURAL:

Re-enforcing of existing roof structure for new HVAC units.

ELECTRICAL:

Re-worked entire electrical systems for offices and warehouse. New distribution for new warehouse equipment. Increased warehouse lighting with new high bay fixtures. New high grade lighting system, alarm and showroom lighting.

CONSTRUCTION TIME:

Sixteen (16) weeks

 

PARTICULARITIES

Project was done in two (2) phases. Delivered warehouse in first phase for scheduled delivery of warehouse equipment installation during construction holidays

 

REFERENCES:

Mr. Leonard Miller, President

Tel.: 514-333-7171

 

> Click here to return to office buildings category.

SUPER 8 HOTEL | Tridôme | Tridôme

SUPER 8 HOTEL

Category: Commercial buildings

NAME:

SUPER  8 HOTEL

LOCATION:

Sainte-Agathe, Que.

DELIVERY DATE:

2006

 

CONSTRUCTION DETAILS

 

TYPE:

Turnkey (Design Build) Project

New Construction –Pre-fabricated  wood  frame structure

SIZE:

30,000sq.ft.    

PROJECT COST:

$ 5,600,000

NBR STOREYS:

Three and one half (3 ½  )  storeys, 78 rooms, 1 conference room, indoor swimming pool & 40 foot high slide

CEILING HEIGHT:

9 feet – 40 feet at pool

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

The building was constructed in a very mountainous and forested  region thus necessitating critical layout of base building and infrastructures.  Careful planning of floor elevations and parking areas produced a magnificent holiday resort.  The building is built completely of pre-fabricated wood structural modules, and load bearing walls sitting on conventional concrete foundations.  The property also benefits from an indoor pool c/w water slides and water games.  The facades are composed of real cut stone and “hardy planking”

MECHANICAL:

Central air conditioning for common areas, corridors etc. Individual air conditioning wall units for rooms and conference room.  Specialized “Dryotron dehumidifying system” in pool area.  Sprinkler fire protection throughout.  Garbage chute on all floors.

STRUCTURAL:

Wood frame structural modules, sloped wood truss roof, conventional concrete foundations.  Ground floor is “split-level”, all pre-fabricated wood floors have 2” thick concrete slabs poured over the plywood

ELECTRICAL:

1000 amps main c/w distribution on 3 ½ floors with sub-stations on each floor

CONSTRUCTION TIME:

Seven and a half (7 ½)  months

 

PARTICULARITIES

All architectural, structural, mechanical and electrical design coordination and permit approvals were the responsibility of TRIDOME, on a “Design build” basis.

 

The building being set on an undeveloped mountainside, it was necessary to build a new City road with all its infrastructure such as, water, sewer, gaz, fire protection, electricity etc. to service the new property.   This road was built by TRIDOME and then given back to the City of Ste-Agathe-des-Monts.

 

All floors are sound insulated with 2” of concrete over the plywood, and the Plenum space in the floor with sprayed insulation.  All walls between rooms are sound insulated with 2”x6” wood studs, and the space filled with batt insulation and 2 layers of 5/8” gyproc on both sides, screwed to resilient bars

 

REFERENCES:

Dale W. Bowler, Project Manager

Tel. 780-416-2095

Architect:  Andre Roy, architect

Tel. 418-648-1032

 

> Click here to return to commercial buildings category.

SHAARE ZION SYNAGOGUE | Tridôme | Tridôme

SHAARE ZION SYNAGOGUE

Category: Institutional buildings

NAME:

ShaAre Zion Synagogue

LOCATION:

Cote St. Luc, Que.

DELIVERY DATE:

1997

 

CONSTRUCTION DETAILS

 

TYPE:

Major renovation and structural changes

SIZE:

10,000 sq.ft

PROJECT COST:

$ 900,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

18 ft

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

The entire main lower lobby and Cummings Hall were totally gutted to the original exposed structure. New coffered ceiling in the lobby and curved ceilings in the main hall were built. Due to the fact that the original design was “over budget”, Tridôme proposed several “cost saving” measures which enabled the project to proceed – including the complete re-design of the ceiling in the main hall. There were several new solid mahogany “built-ins” including the bar, the cloakroom area, and display cases.

MECHANICAL:

Complete new distribution system for air conditioning and heating.

STRUCTURAL:

New full span beams to eliminate several columns and new openings in bearing walls.

ELECTRICAL:

Complete new wiring of entire hall and entry area with new high quality suspended fixtures and wall sconces.

CONSTRUCTION TIME:

Four (4) months

 

PARTICULARITIES

High quality wall finishes. New mahogany panelling throughout with solid mahogany crown moldings and chair rail moldings. The existing oak floor was completely re-done.

 

REFERENCES:

Dan Yanko, Head of Building Committee

Tel.: 514-342-3996

 

> Click here to return to institutional buildings category.

FORTRESS INVESTMENTS | Tridôme | Tridôme

FORTRESS INVESTMENTS

Category: Office buildings

NAME:

FORTRESS INVESTMENTS

LOCATION:

Saint-Leonard, Que.

DELIVERY DATE:

2004

 

CONSTRUCTION DETAILS

 

TYPE:

Construction of a new free standing mini storage building

SIZE:

43,600 sq.ft.

PROJECT COST:

$ 1,900,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

12 feet clear

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Insulated metal, sandwich type, panels, decorative concrete blocks at façade. EPDM roofing membrane. Paving and grass. 44 overhead doors. Prepainted metal siding.

MECHANICAL:

Design-Build mechanical. Gas fired unit heaters. Complete “Design-Build” sanitary and storm systems. Sprinklers throughout the building.

STRUCTURAL:

Design-Build independent steel structure.

ELECTRICAL:

Design-Build. 400 Amps / 600 volts entry. Complete lighting on interior and exterior areas. Smoke detectors and electric fans. CO2 detector and emergency lighting.

CONSTRUCTION TIME:

Twelve (12) weeks

 

PARTICULARITIES

Building of many cubicles in steel studs and drywall for storage enclosures. Each cubicle has its own door and lock and access from the exterior.

 

REFERENCES:

David Gameroff, President

Tel.: 514-933-0599

 

> Click here to return to office buildings category.

FORTRESS INVESTMENTS | Tridôme | Tridôme

FORTRESS INVESTMENTS

Category: Office buildings

NAME:

FORTRESS INVESTMENTS

LOCATION:

Laval, Que.

DELIVERY DATE:

2004

 

CONSTRUCTION DETAILS

 

TYPE:

One storey extension to mini storage building.

SIZE:

22,250 sq.ft.

PROJECT COST:

$ 977,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

Twelve (12) feet clear

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Metal siding sandwich type. EPDM roofing membrane. Decorative concrete blocks liner part of walls. Paving and grass. Two levels of slabs to match natural elevation of site.

MECHANICAL:

Design-Build mechanical. Gas fired heaters. Complete “Design-Build” sanitary and storm systems.

STRUCTURAL:

Design-Build free standing structural steel structure

ELECTRICAL:

Design-Build electrical. Connect to existing installation. Lighting for corridors / Units. Exterior lights at man doors and fans.

 

 

CONSTRUCTION TIME:

Twelve (12) weeks

 

PARTICULARITIES

Building of small cubicles for storage in steel studs and drywall. Each cubicle has its own door (special type) and lock.

 

REFERENCES:

David Gameroff, President

Tel.: 514-933-0599

 

> Click here to return to office buildings category.

FIRST PROFESSIONAL MANAGEMENT - BLDGS “L” & “N” | Tridôme | Tridôme

FIRST PROFESSIONAL MANAGEMENT - BLDGS “L” & “N”

Category: Commercial buildings

NAME:

First Professional Management- Bldgs “L” &  “N”

LOCATION:

Laval, Que.

DELIVERY DATE:

2003

 

CONSTRUCTION DETAILS

 

TYPE:

Multi tenants retail stores – Two (2) base building – Turn Key project

SIZE:

Bldg “L”: 6,600 sq.ft. for 3 tenants: Radio Shack, E.B. Games andLa Belle Province

Bldg “N”:8,000 sq.ft. for 2 tenants: Lunetterie New Look andClaire France

PROJECT COST:

$ 1,150,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

12 feet

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Free standing buildings. Masonry / Insulated Acrylic System – Aluminum store front – Common mechanical / electrical room – Garbage rooms

MECHANICAL:

Roof top heating / air conditioning units – Distribution of one tenant – Underground sanitary and water piping ready for tenants

STRUCTURAL:

Free standing steel structure

ELECTRICAL:

Individual electrical entry for each tenant from main electrical room. Exterior lighting on building

CONSTRUCTION TIME:

Fourteen (14) weeks

 

PARTICULARITIES

High parapets at multiple heights for receiving tenant’s signage – Mitoyen walls at each tenant.

 

REFERENCES:

Mr. Sean MacFarlane, Construction Manager

Tel.: 613-721-2200, ext. 3

 

 

> Click here to return to commercial buildings category.

FIRST PROFESSIONAL MANAGEMENT -WINNERS | Tridôme | Tridôme

FIRST PROFESSIONAL MANAGEMENT -WINNERS

Category: Commercial buildings

NAME:

First Professional Management -Winners

LOCATION:

Montreal, Que

DELIVERY DATE:

2003

 

CONSTRUCTION DETAILS

 

TYPE:

Commercial retail store – Free standing

SIZE:

28,000 sq.ft.

PROJECT COST:

$ 2,100,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

10 and 11 feet

LOADING DOCKS:

One (1)

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Masonry / Insulated Acrylic System – High parapets – Automatic glass sliding doors

MECHANICAL:

Roof top units heating and ventilation – Gas fuel unit heater at loading area – Public washrooms – Sprinkler protection throughout – Energy management system

STRUCTURAL:

Free standing steel structure

ELECTRICAL:

600 amp – 347 / 600 volts main entry – Complete distribution – Decorative valences – Fire alarm system – Security system

CONSTRUCTION TIME:

Fourteen (14) weeks

 

PARTICULARITIES

Complete interior finishing of store, counters, ceramic and vinyl floor tiles, wall coverings, slat walls, decorative valences and bulkheads

 

REFERENCES:

Mr. Luc Fréchette, Construction Manager

Tel.: 613-721-2200, ext. 2

 

> Click here to return to commercial buildings category.

CONGREGATION BETH-EL (2005) | Tridôme | Tridôme

CONGREGATION BETH-EL (2005)

Category: Institutional buildings

NAME:

CONGREGATION BETH-EL (2005)

LOCATION:

Town of Mont Royal, Que.

DELIVERY DATE:

2005

 

CONSTRUCTION DETAILS

 

TYPE:

Renovation of public corridors, chapel, offices and men and women’s washrooms in an existing synagogue.

SIZE:

4,000 sq.ft.

PROJECT COST:

$600,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

7 feet to 15 feet

LOADING DOCKS:

N/A

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Complete demolition of 1950’s existing construction of plaster, lathe and terracotta walls, and concrete slab. Reconstruction of all walls and ceilings with new highly detailed gyproc ceilings and tiles. Solid cherry doors, wood paneling and numerous chair rail and crown moldings. Quarry cast paneling, moldings and baseboards. Washrooms have been completed with granite countertops. New custom made mirrors and furnishings.

MECHANICAL:

New HVAC complete system and distribution for chapel and rebalanced the existing system for new layout. All new under slab rough in pipes and new fixtures within new washrooms.

STRUCTURAL:

N/A

ELECTRICAL:

All new lighting fixtures and re-worked the existing electrical distribution.

CONSTRUCTION TIME:

Twelve (12) weeks

 

PARTICULARITIES

All “High End” finishes on an extremely tight schedule.

 

REFERENCES:

Mr. Leonard Sheiner,  Tel.: (514) 876-4300


 

> Click here to return to institutional buildings category.

CENTRE SPORTIF VALLEE DU RICHELIEU | Tridôme | Tridôme

CENTRE SPORTIF VALLEE DU RICHELIEU

Category: Commercial buildings

NAME:

CENTRE SPORTIF VALLEE DU RICHELIEU

LOCATION:

Ste Julie, Quebec

DELIVERY DATE:

May 2006

 

CONSTRUCTION DETAILS

 

TYPE:

New free standing, single use Soccerplex

SIZE:

32,500 sq.ft.

PROJECT COST:

$3,000,000

NBR STOREYS:

Soccerfield 1 floor – offices 2 floors

CEILING HEIGHT:

36 feet clear hight

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Hi Tech design approach with multi colored curtain wall panels on the façade.  Complete building perimeter in vertical, low profile steel pre-painted metal-siding, prefabricated sandwich panels (as per cold storage building construction). High visibility from autoroute 20, therefore several significant design considerations for city approvals.

MECHANICAL:

Complete HVAC system with 17.5 T. central air for office portion, and ventilation only for the soccer area. The building is completely sprinklered.  Specialized renewable energy system combining solar collection panels on the building perimeter, in order to lower energy consumption costs.  The heating system for the soccer portion is a total electrical energy, infrared radiant technology.

STRUCTURAL:

Clear span “column – free” steel structure 124 feet clear, with a 36 foot clear height, steel roof trusses of 8 feet deep.

ELECTRICAL:

Specialized field lighting fluorescent type.  There is a 400 amp, electrical entry.

CONSTRUCTION TIME:

6 Months

 

PARTICULARITIES

This new free standing, “column free” soccerplex is the 1st one to be built in the municipality and is designed to play “2 aside” teams.  There are also separate areas for golf practice and driving range.  The soccerfield  itself is built on a compacted gravel area with new specialized soccer-turf integrated with a synthetic granular material.  The office area is above the ground level-locker rooms.  There is a special ventilation system integrated with the solar heating system and the infra-red technology.  The solar panels are the newest “SOLARWALL” technology of approximately 2000 sq.ft.

 

REFERENCES:

Marc Ethier, Owner, Tel. 514-774-7026

Michel Perusse, Architect, Tel. 450-641-3366

 

> Click here to return to commercial buildings category.

CANDERM PHARMA INC | Tridôme | Tridôme

CANDERM PHARMA INC

Category: Industrial buildings

NAME:

CANDERM PHARMA INC

LOCATION:

Montreal, Quebec

DELIVERY DATE:

2004

 

CONSTRUCTION DETAILS

 

TYPE:

New 3-storey extension and a “multi-phased” renovation of existing offices – “Design-Build” Turn Key project

SIZE:

17,000 sq.ft. new warehouse, 12,000sq.ft. new and renovation

PROJECT COST:

$ 3,000,000

NBR STOREYS:

Three (3)

CEILING HEIGHT:

9 feet, each floor

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

An elegant design combinationof pre-cast and black glazed curtain wall. An existing office and warehouse building was renovated to accommodate a new 17,000 sq.ft. 3-storey addition. The two buildings were designed and incorporated to make them look as one.

MECHANICAL:

New plumbing, ventilation and sprinkler systems and modifications to existing mechanical systems.

STRUCTURAL:

Steel structure with standard foundations. Underpinning of existing front foundation section.

ELECTRICAL:

New electrical entry for new addition complete with a new lighting system. Modification and upgrade of the existing electrical entry and reworked the existing lighting.

CONSTRUCTION TIME:

Eight (8) months

 

PARTICULARITIES

Two phase project. First phase: complete new 17,000 sq.ft. office and warehouse. Second phase: to demolish existing offices and construct new offices and warehouse space.

 

REFERENCES:

Mr. Barry Vogel, President

Tel.: 514 334-3835

 

> Click here to return to industrial buildings category.

CANADIAN TIRE CORPORATION LTD. | Tridôme | Tridôme

CANADIAN TIRE CORPORATION LTD.

Category: Commercial buildings

NAME:

CANADIAN TIRE CORPORATION LTD.

LOCATION:

Magog, Quebec

DELIVERY DATE:

2006

 

CONSTRUCTION DETAILS

 

TYPE:

Retail store extension

SIZE:

33,000 sq.ft

PROJECT COST:

$ 4,200,000

NBR STOREYS:

One (1) storey, two different roof levels

CEILING HEIGHT:

Twenty feet – 0 inches

LOADING DOCKS:

One existing loading dock, which was renovated. Two new overhead direct-entry doors.

 

SPECIAL FEATURES

 

ARCHITECTURAL:

This extension to the existing store was performed while keeping the day to day activities uninterrupted.  Minimum disturbance was permitted to the pedestrian circulation of the store itself.  The new  building was built totally from the outside first, and then structural connections were made, and the demising wall was demolished at the very end on a weekend.  The entire parking area was re-sloped and a new underground drainage system installed, connected to the existing.

MECHANICAL:

Extension and addition to existing HVAC services.

STRUCTURAL:

New foundations, steel structure and steel deck.  Specialized structural beams and supports for the additional snow loading were created and connected to the existing steel.

ELECTRICAL:

Extension and addition to existing electrical services.

CONSTRUCTION TIME:

Six (6) months

 

PARTICULARITIES

All these works were coordinated with the store operator and were completed without interruption of any daily activities of the retail operations.

 

REFERENCES:

Mr. David Duivesteyn, Project Manager Canadian Tire

Tel:  416 480-3000

Architect: David Poulin, Rubin & Rotman architects

Tel.  514-861-5122

 

> Click here to return to commercial buildings category.

FIRST PROFESSIONAL MANAGEMENT – BUILDING “B” | Tridôme | Tridôme

FIRST PROFESSIONAL MANAGEMENT – BUILDING “B”

Category: Commercial buildings

NAME:

FIRST PROFESSIONAL MANAGEMENT – Building “B”

LOCATION:

Berryfield shopping centre - Valleyfield, Quebec

DELIVERY DATE:

2002

 

CONSTRUCTION DETAILS

 

TYPE:

Construction of a commercial center for five (5) tenants: Reitmans, Yellow shoe, Dollarama, Marie-Claire andClaire-France.

SIZE:

25,000 sq.ft.

PROJECT COST:

$ 1,000,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

18 feet clear

LOADING DOCKS:

n/a

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Tridome’s mandate was to build the building shell, including the demising walls. The interior finishing was to be done by each tenant. Tridome was responsible to hire the architect and perform all design coordination.

MECHANICAL:

Erection of a conventional steel structure with bay sizes of 30’ x 30’

STRUCTURAL:

Supply and installation of roof top units. Installation of the sanitary and storm drainage system. The interior finishing was to be done by each tenant.

ELECTRICAL:

Installation of the main electrical entry with independent switches. Electrical distribution was to be done by each tenant.

CONSTRUCTION TIME:

Ten (10) weeks

 

PARTICULARITIES

This project was done as a “Design Build” project.

 

REFERENCES:

Mr. Luc Fréchette, Project Manager for First Professional Management

Tel.: (613) 721-2200

 

> Click here to return to commercial buildings category.

CENTRE TECHNIQUE CAMOPLAST | Tridôme | Tridôme

CENTRE TECHNIQUE CAMOPLAST

Category: Office buildings

NAME:

CENTRE TECHNIQUE CAMOPLAST

LOCATION:

Magog, Quebec

DELIVERY DATE:

2007

 

CONSTRUCTION DETAILS

 

TYPE:

“Turn-Key” design-build “Fast-Track” construction of a Research and Development facility of 20, 000 sq.ft. offices and 24,000 sq. ft. of laboratories and workshops.

SIZE:

44,000 sq. ft.

PROJECT COST:

$5,150,000.00

NBR OF STOREYS:

1 floor

CEILING HEIGHT:

10 feet and 12 feet in in offices, 25 feet clear in the laboratories and workshops

LOADING DOCK

1

 

SPECIAL FEATURES

ARCHITECTURAL:

Main facade and main entry in a large curved radius curtain wall in anodized aluminum and reflective blue glazing.  Sun shade over the main facade in anodized aluminum tubes.  Main facade in flat anodized Alpolic aluminum and cantilevered front canopy with recessed lighting, and lighting over the windows.  The office section is on one floor in the form of a “L” with a mitoyen wall to the laboratories.  Main entry has raised ceiling with specialized lighting.  The office section has 20,000 sq. ft. of finished office space for 100 employees.

MECHANICAL:

Heating and air conditioning by gas-fired roof top units in several zones and computerized energy saving systems were installed using graphic outlines and Orcaweb software, which allowed all controls to be centralized for the heating, lighting, and security access by card readers

STRUCTURAL:

Conventional steel structure at three different heights.  The steel structure in the lab and workshop area was designed to receive 2 – 10 ton rolling overhead cranes.  The section of the workshop and atelier was specially designed and separated structurally to stop all vibrations and noise transmissions to the offices by the workshops. The structure was designed for a future extension.

ELECTRICAL:

Electrical entry of 600 amps with provisions for a future upgrade to 1,000 amps including all underground conductors and padmount transformer, and metal halide lighting, non-reflective lenses.  “Daylight type” florescent fixtures in office space.  Incandescent recessed fixtures for the conference rooms.  Underground conduits on pedestals to supply the conference room tables.

CONSTRUCTION TIME:

6 months

 

PARTICULARITIES

The project was located in a new section of the Magog industrial park.  Therefore, the work was begun prior to the actual road access being installed, and a temporary road was built for construction access. Also, as it was a “Fast-Track” project, the construction began prior to completion and coordination of all working drawings.  Nevertheless, the overall original budget was maintained to within 2.5%.

 

REFERENCES:

Mr. Eric Bellefleur

Camoplast

819 868 1500 x 3303

 

> Click here to return to office buildings category.

SMART CENTERS INC - Building # C1 and C2 | Tridôme | Tridôme

SMART CENTERS INC - Building # C1 and C2

Category: Commercial buildings

 

NAME:

SMART CENTERS INC - BUILDING # C1 and C2

LOCATION:

Montreal North, Quebec

DELIVERY DATE:

2007

 CONSTRUCTION DETAILS

 

TYPE:

Commercial retail – Free standing building

SIZE:

10,000 sq. ft.

PROJECT COST:

$950,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

18’-6”

LOADING DOCKS:

-----

 

SPECIAL FEATURES

 

ARCHITECTURAL:

This building was divided into two major tenant space – one for the TD Bank and one for Dormez-vous Sleep Center.  Masonary/Insulated Acrylic System.  High parapets with one two-storey corner “clock tower”.  Automatic glass sliding doors.

MECHANICAL:

Roof top units for heating and ventilation complete with energy management systems.  Specific zoned humidification systems for the bank.  Public washrooms, sprinkler protection throughout..

STRUCTURAL:

Free standing steel structure.

ELECTRICAL:

2 separate entries of 200 amp, 347/600V

CONSTRUCTION TIME:

Twelve (12) weeks.

 

PARTICULARITIES

All “base building” elements for the TD Bank were incorporated into the constructions – including a “drive-thru” teller window and all special humidification, electrical and mechanical requirements for the Bank, as per TD specifications.

 

REFERENCES:

Steve Gravel

Smart Centers Construction Manager

Tel: 613.721.2200 x 225

 

> Click here to return to commercial buildings category.

POLICE STATION - PIERREFONDS | Tridôme | Tridôme

POLICE STATION - PIERREFONDS

Category: Industrial buildings

 

NAME:

POLICE STATION - PIERREFONDS

LOCATION:

Pierrefonds, Quebec

DELIVERY DATE:

July 2010

 

CONSTRUCTION DETAILS

 

TYPE:

The new Police Station in Pierrefonds is a project of 8000 sq. ft. It is a two-story building with a green and a white roof. This is the first LEED Gold project in the "design built" category for the city of Montreal

  • Improved energy efficiency: + 60%
  • Wheel thermal solar wall lamps solar and geothermal
  • Occupant detection from the outside
  • Almost 50% saving in water
  • Landscaping is planned without irrigation

 

SIZE:

8000 sq. ft. 

PROJECT COST:

$3 500 000 

NBR STOREYS:

CEILING HEIGHT:

8’ 

LOADING DOCKS:

N/A

 

SPECIAL FEATURES

 

ARCHITECTURAL:

The facades have a lot of windows in order to have as much as possible the natural light and reduce electricity consumption. In addition, all products used were chosen to meet the requirements of LEED.

STRUCTURAL:

A thorough calculation allowed the use of controlled backfill in place of the pious (for economy and speed of execution).

MECHANICAL:

Products and materials were chosen to meet the LEED requirements.  (LEED lighting, geothermal, solar wall, etc ...). 

ELECTRICAL:

N/A

CONSTRUCTION TIME:

10 months

 

PARTICULARITIES

Given the tight schedule, the project was executed in "fast track". In addition it is the first LEED Gold project for the City of Montreal. To meet this, the City of Montreal had to adjust their standards. (hybrid vehicles). 

 

REFERENCES:

Myrithe Yassa, City of Montreal

Tel:  514 280 4156

 

> Click here to return to industrial buildings category.

ADM - REINFORCEMENT OF THE EAST RAMP | Tridôme | Tridôme

ADM - REINFORCEMENT OF THE EAST RAMP

Category: Industrial buildings

NAME:

ADM - REINFORCEMENT OF THE EAST RAMP

LOCATION:

Dorval Airport, Montreal, Quebec

DELIVERY DATE:

December 2009

 

CONSTRUCTION DETAILS

 

TYPE:

Public project. Reconstruction of the main east access ramp of the Montreal airport

SIZE:

2000 sq. ft.

PROJECT COST :

$135,000

NBR STOREYS:

N/A

CEILING HEIGHT:

N/A

LOADING DOCKS:

N/A

 

SPECIAL FEATURES

 

ARCHITECTURAL:

N/A

STRUCTURAL:

Stripping of the concrete in specific locations under the main ramp and the colums, adding reinforcement (columns and beams) and structural steel in the concrete, temporary support of the slab during the execution of the work. Secure closure around the work

MECHANICAL:

N/A

ELECTRICAL:

N/A

CONSTRUCTION TIME:

3 months

 

PARTICULARITIES

Construction on the main ramp of the existing arrivals at the Montreal Airport. The work was done in a closed and same area as passengers had access to this area.

 

REFERENCES:

Anne Belhumeur, Dorval Airport

 

Tel: 514 633 3976

 

> Click here to return to industrial buildings category.

ST HUBERT LIBRARY - CITY OF LONGUEUIL | Tridôme | Tridôme

ST HUBERT LIBRARY - CITY OF LONGUEUIL

Category: Institutional buildings

 

NAME:

ST HUBERT LIBRARY - CITY OF LONGUEUIL

LOCATION:

St Hubert, Quebec

DELIVERY DATE:

November 2010

 

CONSTRUCTION DETAILS

 

TYPE:

Construction of a new library 

SIZE:

42,900 sq. ft. 

PROJECT COST:

11 million 

NBR STOREYS:

CEILING HEIGHT:

+ 20’ 

LOADING DOCKS:

N/A

  

SPECIAL FEATURES

 

ARCHITECTURAL:

Shelving, furniture, curtain wall, many green roof, exposed concrete 

STRUCTURAL:

Several roof slopes 

MECHANICAL:

Geothermal, radiant heating, remote control 

ELECTRICAL:

LEED special lighting 

CONSTRUCTION TIME:

12 months

 

PARTICULARITIES

Award of excellence from the Canadian architectect magazine.  Award of excellence for the steel structure from the Quebec Order of Engineers

 

REFERENCES:

Michel Bourassa

Tel: 514 527 8821

 

> Click here to return to institutional buildings category.

ALLIANCE STEEL (PHASE II) | Tridôme | Tridôme

ALLIANCE STEEL (PHASE II)

Category: Industrial buildings

 

NAME:

ALLIANCE STEEL (phase II)

LOCATION:

Laval, Quebec

DELIVERY DATE:

2003

 CONSTRUCTION DETAILS

 

TYPE:

Heavy industrial building extension – “Design-Build” Turn Key project

SIZE:

30,000 sq.ft.

PROJECT COST :

$ 2,800,000

NBR STOREYS:

One (1)

CEILING HEIGHT:

33 feet clear

LOADING DOCKS:

Two (2)

 SPECIAL FEATURES

 

ARCHITECTURAL:

Metal sandwich panel system with continuous perimeter girts at 4 feet High. Two 16’x22’ overhead garage doors.

STRUCTURAL:

Reinforced steel structural slab of 13” thick to support 10,000 lb. per sq.ft. of live load (steel coils stacked to 20 ft high). Two rolling overhead crane structures – totally (separate columns) independent of the main structure to support 40 tons live – load each. Design provisions for future extension on columns and foundation. Complete decontamination of 5 ft. deep soil. Complete and separate de-watering system under the slab to evacuate an underground spring, linked to a drainage system, and double sump pumps in pits (on independent generator system).

MECHANICAL:

Gaz forced-air heating units with a system of carbon monoxide and diesel vapor evacuation system inter linked – with a high intensity evacuation system.

ELECTRICAL:

Hi-bay high-pressure halide lighting. 1000 Amp. entry and distribution and generator line.

CONSTRUCTION TIME:

ten (10) months

 

PARTICULARITIES

This project was performed on a complete “Turn-Key” “Design Build”. Work was donewithout any interruption of the daily activities of the company.

 

REFERENCES:

Mr. Michael Deitcher, President Tel.: (514) 382-5783, ext. 254 

 

> Click here to return to industrial buildings category.

PINACLE CONDOS | Tridôme | Tridôme

PINACLE CONDOS

Category: Condos

 

NAME:

PINACLE CONDOS

LOCATION:

Laval, Quebec

DELIVERY DATE:

January 2011

 CONSTRUCTION DETAILS

 

TYPE:

Construction of Condos Design-Build

SIZE:

 

PROJECT COST :

$2.7 million

NBR STOREYS:

3 floors

CEILING HEIGHT:

 

LOADING DOCKS:

 

 

SPECIAL FEATURES

 

ARCHITECTURAL:

This waterfront project consists of the construction of six prestigious condominiums. 

STRUCTURAL:

This project was done as a conventional poured-in-place concrete structure. 

MECHANICAL:

There is 1 level of structural slab and underground parking garage.

ELECTRICAL:

 

CONSTRUCTION TIME:

11 months

 

PARTICULARITIES

The finishing is a high end quality (hardwood floor, kitchens in hardwood and granite countertops).  There is 1 hi-speed elevator.

 

REFERENCES:

Rabih Khazaka, Architect

Tel:  514 331 4777

 

> Click here to return to condos category.

CONDOS WARD | Tridôme | Tridôme

CONDOS WARD

Category: Condos

 

NAME:

WARD CONDOS

LOCATION:

St Laurent, Quebec

DELIVERY DATE:

July 2010

 CONSTRUCTION DETAILS

 

TYPE:

Construction of Condos Design-Build

SIZE:

 

PROJECT COST:

$6.8 million

NBR STOREYS:

42 condominium on 6 floors

CEILING HEIGHT:

 

LOADING DOCKS:

NA

 SPECIAL FEATURES

 

ARCHITECTURAL:

 

STRUCTURAL:

This project consists of a new building construction of 42 condominiums on 6 floors, with 1 level of underground parking and a structural ground floor slab.  The other floor slabs are prefabricated concrete and the exterior walls are also prefabricated concrete.  These walls are a “complete system” from exterior stone finish to interior gyproc.  The project had been designed originally as a conventional slab and wall system and TRIDÔME re-designed it with the architect to provide a more economical “turn-key” project. 

MECHANICAL:

There is 1 hi-speed elevator  

ELECTRICAL: 

 

CONSTRUCTION TIME:

8 months

 

PARTICULARITIES

The particularity of this project is that the developers decided to change the plans just before the construction was to begin (modified from a conventional structure to a prefabricated structure and facades).  Thus the necessity to work on a "fast track" basis while respecting the budget and the initial amount of the signed contract.  The entire project was erected over the winter. 

 

REFERENCES:

Rabih Khazaka, Architect

Tel:  514 331 4777

 

> Click here to return to condos category.

McGILL UNIVERSITY - LYMAN DUFF | Tridôme | Tridôme

McGILL UNIVERSITY - LYMAN DUFF

Category: Institutional buildings

 

NAME:

McGILL UNIVERSITY - LYMAN DUFF

 

LOCATION:

Montreal, Quebec

 

DELIVERY DATE:

January 2011

 CONSTRUCTION DETAILS

 

TYPE:

Addition of a sprinkler and renovation of laboratories and an auditorium. 

SIZE:

250,000 sq. ft. 

PROJECT COST :

$2,600,000 

NBR STOREYS:

8’ 

CEILING HEIGHT:

8’ and 15’ 

LOADING DOCKS:

N/A

 SPECIAL FEATURES

 

ARCHITECTURAL:

Renovation of all the ceilings (classrooms and laboratories) and one auditorium of 300 students. 

STRUCTURAL:

N/A 

MECHANICAL:

Addition of a sprinkler system in the whole building and a sprinkler pump. 

ELECTRICAL:

Changing all the lighting system, addition of all the fire alarm system. 

CONSTRUCTION TIME:

8 months, work at night, very difficult schedule.

 

PARTICULARITIES

Working in an existing building, all work done at night, and all offices and classrooms occupied during the day.  Schedule was done day by day. 

 

REFERENCES:

Louis Boissonneault, Engineer

Cell:  514 713 7745

 

> Click here to return to institutional buildings category.

RENOVATIONS OF A NEW STUDENT RESIDENCE, McGILL UNIVERSITY | Tridôme | Tridôme

RENOVATIONS OF A NEW STUDENT RESIDENCE, McGILL UNIVERSITY

Category: Institutional buildings

 

NAME:

RENOVATIONS OF A NEW STUDENT RESIDENCE, McGILL UNIVERSITY

LOCATION:

Montreal, Quebec

DELIVERY DATE:

April 2010

 CONSTRUCTION DETAILS

 

TYPE:

Public project in prequalification. Renovation, according to the "fixed price" method, of the old "Four Points" and its conversion to a new student residence for McGill University.

SIZE:

130 000 sq. ft.

PROJECT COST :

$2,500,000

NBR STOREYS:

15

CEILING HEIGHT:

10 ft for the rooms, 15 ft for the hall entrance

LOADING DOCKS:

N/A

 SPECIAL FEATURES

 

ARCHITECTURAL:

Installation of a new security camera on the existing varnished terrace, installation of a new insulated varnish with security camera on all the other 14 floors.  Selective demolition and patching of the site (including patching of the tapestry).  Construction of new telecommunication facilities. Construction of a new cafeteria and new kitchen.  Complete renovation of 200 student bedrooms. 

STRUCTURAL:

Reinforcement of the roof, stripping and repairing of the concrete in various floors of the basement. 

MECHANICAL:

Added a sprinkler system in all rooms.  Added Internet and TV connection in all rooms.  Created a telecommunication rooms on all floors. 

ELECTRICAL:

Improved the capabilities of the electrical panels of the students’ rooms.  Added duct work in each room so that the University can do its work in telecommunications cabling (telephone, internet, television), updated common areas, new power supply for the kitchen and cafeteria. 

CONSTRUCTION TIME:

10 months

 

PARTICULARITIES

Many of the changes were requested by the owner, which resulted in an extension of the timetable.  Construction took place in an area occupied by students where there was a need for temporary security.  The work was required to be done during the night and weekends. 

 

REFERENCES:

Adrian Nicolicescu, McGill University

Cell : 514 398 1864 

 

> Click here to return to institutional buildings category.

CONDOS VAL DES ARBRES – PHASE II | Tridôme | Tridôme

CONDOS VAL DES ARBRES – PHASE II

Category: Condos

 

NAME:

CONDOS VAL DES ARBRES – PHASE II

LOCATION:

Laval, Quebec

DELIVERY DATE:

May 2012

 CONSTRUCTION DETAILS

 

TYPE:

Hambro structure on a “design-build” basis

SIZE:

 

PROJECT COST:

$9.1 million

NBR STOREYS:

6

CEILING HEIGHT:

8' 6"

LOADING DOCKS:

N/A

 SPECIAL FEATURES

 

ARCHITECTURAL:

The construction of this project consists of a new building of 60 condominiums (52 condos and eight penthouses) and 1 level of concrete structural underground garage. 

STRUCTURAL:

The plans for this project have been modified from a conventional structure to a Hambro structure on a “design build” basis, prior to start of construction. 

MECHANICAL:

There are 2 hi-speed elevators. 

ELECTRICAL:

Standard pad mount transformer and distribution. 

CONSTRUCTION TIME:

1 year 

 

PARTICULARITIES

The entire project was erected over the winter 

 

REFERENCES:

Rabih Khazaka, Architect

Tel:  514 331 4777


 

> Click here to return to condos category.

CONCORDIA UNIVERSITY – PAVILION HENRY F. HALL | Tridôme | Tridôme

CONCORDIA UNIVERSITY – PAVILION HENRY F. HALL

Category: Institutional buildings

 

NAME:

CONCORDIA UNIVERSITY – PAVILION HENRY F. HALL

LOCATION:

Montreal, Quebec

DELIVERY DATE:

September 2011

 CONSTRUCTION DETAILS

 

TYPE:

Renovation of H10, H5, H6 and H0 

SIZE:

200,000 sq. ft. 

PROJECT COST:

$5,800, 000 

NBR STOREYS:

15 

CEILING HEIGHT:

10’ and 15’ 

LOADING DOCKS:

N/A

 SPECIAL FEATURES

 

ARCHITECTURAL:

Complete renovation of floors, including 10 laboratories, one auditorium of 150 students, and 25 classrooms 

STRUCTURAL:

N/A 

MECHANICAL:

Addition of sprinkler system and airquity 

ELECTRICAL:

Complete renovation of all the electrical work 

CONSTRUCTION TIME:

9 months, very light schedule for a project of this size

 

PARTICULARITIES

Working in an existing building with different phase dates of completion that we had to respect even though what we had 24% of change orders requested by the owner 

 

REFERENCES:

David Kruse, Engineer

Cell:  514 882 5258

 

> Click here to return to institutional buildings category.

ADM - EXPANSION OF THE COORDINATION CENTRE OF OPERATION PHASE II | Tridôme | Tridôme

ADM - EXPANSION OF THE COORDINATION CENTRE OF OPERATION PHASE II

Category: Industrial buildings

 

NAME:

ADM - EXPANSION OF THE COORDINATION CENTRE OF OPERATION PHASE II

LOCATION:

Dorval, Montreal, Quebec

DELIVERY DATE:

November 2009

 

CONSTRUCTION DETAILS

 

TYPE:

Pre-qualifications public project.  Expansion and renovation on a "fixed price" of the center of coordination Phase II for the offices of Air Canada

SIZE:

12 000 sq. ft.

PROJECT COST :

1 million

NBR STOREYS:

1

CEILING HEIGHT:

10’

LOADING DOCKS:

N/A

  

SPECIAL FEATURES

 

ARCHITECTURAL:

The entrance and the façade consist of windows and metal coating.  The construction and demolition work were executed in phases without interrupting the employee’s acitivities. Construction of new changing rooms and showers with epoxy floor for the employees of Air Canada 

STRUCTURAL:

Adding a floor steel structure to enlarge the changing rooms of Air Canada 

MECHANICAL:

Electric baseboard heating and air conditioning unit on the roof powered with multiple zones and computer system that can control the heating, lighting and card reader access 

ELECTRICAL:

Very sophisticated control system for electric doors, system card reader, scanning system for lighting 

CONSTRUCTION TIME:

6 months

 

PARTICULARITIES

The project was realized in a zone controlled by the Montreal airport.  Hence escorts were required to be able to return to work areas and work.  In addition, construction work was carried out in phases, in areas occupied by the employees and specifically in security areas.  Hence this required to have a close collaboration with the owner and a very controlled construction schedule

 

REFERENCES:

Niki Elias, Montreal Airport

Cell:  514 216 7037

 

> Click here to return to industrial buildings category.

CANADIAN TIRE MAISONNEUVE | Tridôme | Tridôme

CANADIAN TIRE MAISONNEUVE

Category: Commercial buildings

NAME:

CANADIAN TIRE – DE MAISONNEUVE

LOCATION:

Montreal, Québec

DELIVERY DATE:

June 2011

 

CONSTRUCTION DETAILS

 

TYPE:

Major renovations of the Canadian Tire Store

SIZE:

68,000 sq. ft.

PROJECT COST:

2.7 million

NBR STOREYS:

1 1/2

CEILING HEIGHT:

18’

LOADING DOCKS:

NA

 

 

SPECIAL FEATURES

 

ARCHITECTURAL:

Transformed an old restaurant into a “new style” mega store

STRUCTURAL:

Raised the structured roof and retained the existing columns. Excavated and expanded the column footings and new concrete slab

MECHANICAL :

Added a new sprinkler, ventilation and heating system

ELECTRICAL :

Changed all the electrical, alarm, plumbing and fire system

CONSTRUCTION TIME :

7 months

 

PARTICULARITIES :

Work completed in phases in order to keep the commercial business in full operation.  Raising the roof structure was performed during the winter months

 

REFERENCE :

Paul Arella

Tel :  514 693 6452 / Cell :  514 441 4782

 

> Click here to return to commercial buildings category.

The Oaks at Glen Eden in North Carolina | Tridôme | Tridôme

The Oaks at Glen Eden in North Carolina

Category: International

TRIDÔMEOF NORTH CAROLINA was begun in 1998 as a general contractor and developer.

We successfully completed the construction of our first residential project of 50 condominiums in Raleigh, North Carolina,"The Oaks", and are about to start our second project, "The Essex" of 75 new condominiums (combined total of approximately 30 million US dollars).

We formed a joint-venture partnership with a local general contractor in order to expand our operations rapidly.

 

> Click here to return to international category.

Sandwich-panel construction in Argentina | Tridôme | Tridôme

Sandwich-panel construction in Argentina

Category: International

TRIDÔME INTERNATIONAL DEVELOPMENT CORP., a subsidiary of TRIDÔME GROUP, concluded a partnership agreement with a concrete sandwich-panel manufacturer, in 1995. Sandwich-panel technology has been recognized since the early 1980's as being the most efficient, rapid and economical of all the prefabricated housing products on the market. Both the products and the technology are used and have been homologated in a number of countries, such as France, Romania, Costa Rica, Argentina and Mexico.

The walls are composed of two lightweight concrete sandwich panels on metal (steel, aluminum, etc) or treated wood structure, incorporating polystyrene beads. The space between the panels is injected with hi-density polyurethane foam providing not only structural stability for single storey homes, but also a high level of thermal insulation.

One of the major advantages of this composite sandwich-panel is the fact that a 50-m2 home is constructed and ready for occupancy within one week. In addition, the homes offer the highest level of protection against seismic movements, hurricanes and tornadoes. These homes are even totally impervious to insects and troublesome vermin generally found in countries with hot weather.

 

> Click here to return to international category.

The Essex at Glen Eden in North Carolina | Tridôme | Tridôme

The Essex at Glen Eden in North Carolina

Category: International

TRIDÔMEOF NORTH CAROLINA was begun in 1998 as a general contractor and developer.

We successfully completed the construction of our first residential project of 50 condominiums in Raleigh, North Carolina,"The Oaks", and are about to start our second project, "The Essex" of 75 new condominiums (combined total of approximately 30 million US dollars).

We formed a joint-venture partnership with a local general contractor in order to expand our operations rapidly.

 

> Click here to return to international category.

I.D. Foods | Tridôme | Tridôme

I.D. Foods

Category: Grocery anchored centres


NAME:

I.D. FOODS

LOCATION:

Laval, Quebec

DELIVERY DATE:

March 2009

 

CONSTRUCTION DETAILS

 

TYPE

Complete construction was based on an invited tender on “plans and spec’s” for the renovation and extension of a food distribution warehouse for I.D. Foods in Laval.

 

SIZE

70,000 sq.ft. slab-on-grade and 12,500 sq. ft. of mezzanine for a total of 82,500 sq. ft.

 

PROJECT COST

$6 909 047

 

NBR STOREYS:

2

 

CEILING HEIGHT

10 feet clear for the offices and under the mezzanines, and 40 feet clear for the warehouse.

 

SPECIAL FEATURES

 

ARCHITECTURAL

From the main façade and entry from Autoroute # 440, there is a glass curtain wall to match the existing.  There are spacious commercial areas for rent with glass frontages on the 2nd floor with access to the ground floor and mezzanines, all of which also houses the administration of the food warehouse.  The entire space is glazed throughout.

 

STRUCTURAL:

Steel structure of columns and beams conceived for the clear height to be at 40 ft in the warehouse, as well as the complete reinforcing of the existing structure in order to accommodate the additional snow accumulation from the height of the new portion. Slab-on-grade with hardener and fibers to support the heavy loads of the racking and all the moving equipment.  The slab was designed with "zero tolerance" due to the high reach of the owner’s fork lifts. Therefore, the slab was poured "dead-flat," with a highly precise lazer screed machine.

 

MECHANICAL:

Main building heated by suspended gaz-fired units, air conditioning only in the chocolate storage area. There was a special sprinkler system installed in the warehouse area due to the high racking requirements.

 

ELECTRICAL

New electrical entry of 600 amps including all underground conduits and transformer on base.  All lighting in the warehouse was “Hi-Bay” metal halide for the distribution area.

 

CONSTRUCTION TIME:

8 months

 

PARTICULARITIE

During the course of the construction; there were several and significant modifications made by the owner, which TRIDÔME performed always respecting the initial schedule. In addition, all the construction in the existing building was required to be performed without interrupting the owner’s distribution operations. Therefore, all this work was coordinated directly with the owner and was performed in multiple phases to minimize the disturbance. Special temporary protection measures (against air and dust infiltration) were erected to separate the work areas. The use of high efficiency HEPA filters was required to protect all the food products.

 

REFERENCES

Leonard Smolash, ID Foods

Tel : (450) 687-2680 x 4100

Cell : (514) 999-5533

 

> Click here to return to grocery anchored centres category.

MAIMONIDES MEDICAL CENTRE | Tridôme | Tridôme

MAIMONIDES MEDICAL CENTRE

Category:

 

EMMANUEL BETH SHALOM MUSEUM | Tridôme | Tridôme

EMMANUEL BETH SHALOM MUSEUM

 

> Click here to return to institutional buildings category.

GOLDEN AGE ASSOCIATION | Tridôme | Tridôme

GOLDEN AGE ASSOCIATION

 

> Click here to return to institutional buildings category.

MONIT INTERNATIONAL | Tridôme | Tridôme

MONIT INTERNATIONAL

 

> Click here to return to commercial buildings category.

CLASSY (CHAMPLAIN MALL) | Tridôme | Tridôme

CLASSY (CHAMPLAIN MALL)

 

> Click here to return to commercial buildings category.

ECONOMALLS | Tridôme | Tridôme

ECONOMALLS

 

> Click here to return to commercial buildings category.

CLASSY & SOIR DE PARIS | Tridôme | Tridôme

CLASSY & SOIR DE PARIS

 

> Click here to return to commercial buildings category.

BOUTIQUE LE CHÂTEAU (PLACE VERSAILLES) | Tridôme | Tridôme

BOUTIQUE LE CHÂTEAU (PLACE VERSAILLES)

 

> Click here to return to commercial buildings category.

CANADIAN TIRES (SHERBROOKE STREET) | Tridôme | Tridôme

CANADIAN TIRES (SHERBROOKE STREET)

 

> Click here to return to commercial buildings category.

COOPRIX (CLIFFTON GROUP) | Tridôme | Tridôme

COOPRIX (CLIFFTON GROUP)

 

> Click here to return to grocery anchored centres category.

STATE OF ISRAEL BONDS (MONIT INTERNATIONAL) | Tridôme | Tridôme

STATE OF ISRAEL BONDS (MONIT INTERNATIONAL)

Category: Office buildings

 

> Click here to return to office buildings category.

FORTRESS INVESTMENT (WESTMOUNT SQUARE FOR S.I.T.Q.) | Tridôme | Tridôme

FORTRESS INVESTMENT (WESTMOUNT SQUARE FOR S.I.T.Q.)

Category: Office buildings

 

> Click here to return to office buildings category.

DIGITAL EQUIPMENTS | Tridôme | Tridôme

DIGITAL EQUIPMENTS

Category: Office buildings

 

> Click here to return to office buildings category.

CENTRE LOCAL D’EMPLOI REPENTIGNY | Tridôme | Tridôme

CENTRE LOCAL D’EMPLOI REPENTIGNY

Category: Office buildings

 

> Click here to return to office buildings category.

MUNICIPAL LIBRARY (PIERREFONDS) | Tridôme | Tridôme

MUNICIPAL LIBRARY (PIERREFONDS)

 

> Click here to return to institutional buildings category.

PHARMETICS | Tridôme | Tridôme

PHARMETICS

 

> Click here to return to industrial buildings category.

MACMILLAN BATHURST | Tridôme | Tridôme

MACMILLAN BATHURST

 

> Click here to return to industrial buildings category.

JEMDYE INDUSTRIES | Tridôme | Tridôme

JEMDYE INDUSTRIES

 

> Click here to return to industrial buildings category.

INTERCITY TV | Tridôme | Tridôme

INTERCITY TV

 

> Click here to return to industrial buildings category.

TRANSCANADERM | Tridôme | Tridôme

TRANSCANADERM

 

> Click here to return to industrial buildings category.

TEX-DYE (PHASE 2) | Tridôme | Tridôme

TEX-DYE (PHASE 2)

 

> Click here to return to industrial buildings category.

BECO INDUSTRIES (PHASE 2) | Tridôme | Tridôme

BECO INDUSTRIES (PHASE 2)

 

> Click here to return to industrial buildings category.

BECO INDUSTRIES (PHASE 1) | Tridôme | Tridôme

BECO INDUSTRIES (PHASE 1)

 

> Click here to return to industrial buildings category.

Furama Hotel | Tridôme | Tridôme

Furama Hotel

Category: Commercial buildings

Construction of a new 9-story luxury hotel of 108 rooms and suites (complete with long-term stay kitchenettes), including mezzanine, penthouse and underground parking facilities. Complete concrete structure. Glass curtain wall, precast panels and granite. Basic project plans were provided however TRIDÔME and the consultants revised many details together to significantly decrease costs to accomplish budget savings.

 

> Click here to return to commercial buildings category.

EMMANUEL BETH SHALOM TEMPLE | Tridôme | Tridôme

EMMANUEL BETH SHALOM TEMPLE

 

> Click here to return to institutional buildings category.

YM-YWHA SNOWDON | Tridôme | Tridôme

YM-YWHA SNOWDON

Category: Institutional buildings

To come

 

> Click here to return to institutional buildings category.

Villa Medica Hospital | Tridôme | Tridôme

Villa Medica Hospital

Category: Institutional buildings

Multi-storey hi-rise steel and concrete extension. This extension involved "High-End" finishes and specialized glass and canopy designs. A new elevator was added serving 13 floors and 3 basements. A complete renovation of the existing air conditioning and heating system was done. A complete new sprinkler system was added throughout. The entire existing cafeteria was demolished and the new extension incorporated a new "glass enclosed" 2 "clear storey" cafeteria Extensive and meticulous coordination with the owner's operations was required, as the existing facility was a hospital type re-habilitation center. No dust, or noise or interruption of daily activities was permitted.

 

> Click here to return to institutional buildings category.

McGill University | Tridôme | Tridôme

McGill University

Category: Institutional buildings

Construction of the new commercial university bookstore. Historical integration of the design to existing surrounding historical monument buildings. Excavation in bedrock 30' deep, directly against property line on all sides. Complex underpinning of existing adjacent historical monument buildings. Complete facade in hand cut alternating patterns of brand-cut limestone. Concrete slab, columns and beams were designed and built specially to support additional future floors. Computerized energy monitoring systems.

 

> Click here to return to institutional buildings category.

TEX-DYE (PHASE 1) | Tridôme | Tridôme